Dirleton Court

Heat Solution

Black line art battery icon

Sunamp Thermal Battery

Communal Hot Water

Black line art boiler icon

2 Boiler Skid

115kW Cascade

Black line art pipes icon

Plantroom Infrastructure

Pumps and Circuit

KEY ISSUES FACED:

  • All heating plant was deemed at end of life.
  • System pumps were non-compliant and operating inefficiently.
  • Existing pipework and lagging was damaged and dirty.
  • Flue void had no inspection hatches.
  • Aged control panel.

Original client brief:
Gas for gas boiler replacement and plant room upgrade.



Project details

Client:

Places for People

Address:

Dirleton Court, Dirleton Av. EH394QN

HSA Start Date:

July 2023

PROJECT PARTNERS

Boxed Heat Solution


Schematic for Dirleton Court with boiler layout

We delivered a future-proof heating-only plant room system with:


  • x2 Remeha Quinta Ace 115kW Boilers: High-efficiency, cascade-ready heating solution.
  • Heating supply for the plantroom only with flats on independent systems.
  • Secomak SGP-576120 Gas Booster: Regulates pressure for safe, efficient gas supply.

REFURBISHED PLANTROOM

refurbished plantroom

Impact


98.5% gross boiler efficiency achieved.

194,000kWh annual gas savings.

164,900kg CO2 savings per year.

The plant room upgrade resulted in significant performance and reliability improvements:


  • Reliable, fast-response communal hot water supply.
  • Safer gas operation with booster and regulation in place.
  • Independent hot water cylinders improve resilience across flats.
  • Reduced maintenance costs and operational disruption.
  • Industry-leading design and support by a UK manufacturer. ​
  • Advanced BMS increases longevity of all the equipment with better visibility and efficiency of the entire system.
  • A hi-tech, lower-carbon scheme offering consistent energy savings. ​
  • Real-term cost reduction for both the landlord and end-user. ​​
  • Boxed 20-year lifecycle replacement of all primary heating equipment gives complete ‘rep-ex’ cost certainty.

Residents

Black line art icon house with people

Comfort and Affordability:
Consistent heat and hot water.

Energy Cost Savings:
Reduction in residents' energy bills by harnessing ultra-efficient systems.


Landlord

Black line art hand with keys

Operational Cost Reduction:
Energy-efficient technologies with fewer call-outs and reduced maintenance costs.

Long-term Sustainability:
Demonstrates commitment to environmental responsibility.


Environment

Black line art world with leaf

Reduced Carbon Footprint:
Clean energy generation and ultra-efficient systems.

Future-Proof:
Set up to connect with future advancement in sustainable technology.